Building Board in Wet Rooms — BoardeX® — Case Study

Moisture-resistant green board was combined with cement-bonded Boardex in the wet zones; a sealing tape under every track cuts floor water off from the frame. Principal materials: Cement-bonded Boardex sheet, Galvanised profile, Moisture-resistant system. These 19 frames show the detail solutions and the finished surface up close.

Project scope

building board · residence · Istanbul

Go to the service page
Building Board in Wet Rooms — BoardeX® — Istanbul, Ekin Yapı Dekorasyon — Photo 1/19
Building a bathroom bench from steel studs and BoardeX® board.
Building a bathroom bench from steel studs and BoardeX® board.
Building Board in Wet Rooms — BoardeX® — Istanbul, Ekin Yapı Dekorasyon — Photo 3/19
Building Board in Wet Rooms — BoardeX® — Istanbul, Ekin Yapı Dekorasyon — Photo 4/19
Building Board in Wet Rooms — BoardeX® — Istanbul, Ekin Yapı Dekorasyon — Photo 5/19
Building Board in Wet Rooms — BoardeX® — Istanbul, Ekin Yapı Dekorasyon — Photo 6/19
Building Board in Wet Rooms — BoardeX® — Istanbul, Ekin Yapı Dekorasyon — Photo 7/19
Building Board in Wet Rooms — BoardeX® — Istanbul, Ekin Yapı Dekorasyon — Photo 8/19
Building Board in Wet Rooms — BoardeX® — Istanbul, Ekin Yapı Dekorasyon — Photo 9/19
Building Board in Wet Rooms — BoardeX® — Istanbul, Ekin Yapı Dekorasyon — Photo 10/19
Building Board in Wet Rooms — BoardeX® — Istanbul, Ekin Yapı Dekorasyon — Photo 11/19
Building Board in Wet Rooms — BoardeX® — Istanbul, Ekin Yapı Dekorasyon — Photo 12/19
Building Board in Wet Rooms — BoardeX® — Istanbul, Ekin Yapı Dekorasyon — Photo 13/19
Building Board in Wet Rooms — BoardeX® — Istanbul, Ekin Yapı Dekorasyon — Photo 14/19
Building Board in Wet Rooms — BoardeX® — Istanbul, Ekin Yapı Dekorasyon — Photo 15/19
The bathroom finished after the BoardeX work: shower enclosure and wall-hung WC in place.
The bathroom finished after the BoardeX work: shower enclosure and wall-hung WC in place.
The finished basin wall, with the recessed niches and mirror lighting in place.
The finished basin wall, with the recessed niches and mirror lighting in place.
The shower recess with the tiling complete, and the linear drain in the floor.
The shower recess with the tiling complete, and the linear drain in the floor.
The finished shower, after the rain head and mixer were fitted.
The finished shower, after the rain head and mixer were fitted.

Materials used

  • Cement-bonded Boardex sheet
  • Galvanised profile
  • Moisture-resistant system