All Services
Our Services

Steel Stairs & Mezzanines

Steel staircases and mezzanines for duplex flats, ateliers and commercial units. Tread dimensions and balustrade height are set according to the applicable regulations and the project.

Reply within one business day · Free survey · Written scope and quote

Updated:

Steel Stairs & Mezzanines
2007
established

What are steel stairs and mezzanines?

Steel stairs and steel mezzanines are welded steel structures that create more usable space in duplex flats, workshops, lofts, shops and commercial premises. Treads can be timber, laminate, sheet steel or composite; balustrades are finished in steel sections with stainless cable or glass.

Types of steel staircase

  • Straight-flight staircase: the most common type and the usual choice in duplex flats.
  • Spiral staircase: fits into tight spaces and makes a decorative statement.
  • Half-turn staircase: a landing part-way up makes it comfortable to use.
  • Steel mezzanine: adds an extra floor level in shops, workshops and large flats.

What We Offer

Bespoke steel stair

Welded steel structure dimensioned to the space.

Steel mezzanine

A load-bearing platform that adds usable area under a high ceiling.

Balustrade options

Stainless cable, glass or steel-section balustrades.

Timber and steel treads

Laminated timber, solid timber, sheet steel or composite treads.

Who is it for?

Steel Stairs & Mezzanines is suitable for homes, villas, offices and commercial spaces.

What affects price?

Area, selected brand/model, detail level, lighting and site conditions.

What is included?

Measurement, scope, material brand/model, workmanship and delivery terms are stated in writing.

Application process

Consultation, free survey, written quote, scheduled work and clean handover.

How We Work

At Ekin Dekorasyon ve Yapı Sistemleri the survey, the written scope and the clean handover work the same way on every project.

  • Load-bearing steel built to the structural calculation
  • Made-to-measure welded fabrication and installation
  • Epoxy primer and topcoat against corrosion
  • Answers for tight spaces (spiral, half-turn)
  • One-year workmanship warranty

Our Process

1

Preliminary assessment and survey

We first assess the job remotely and take measurements on site once the scope is clear.

2

Design & quote

We propose a solution that fits your needs and a detailed price quote.

3

Materials & preparation

Materials are sourced and the installation plan is prepared.

4

Planned installation

We carry out the work to plan, carefully and cleanly.

5

Handover

The work is completed and handed over within the scope and terms set in the written quote and contract.

FAQ

Frequently Asked Questions About Steel Stairs & Mezzanines

We have compiled the topics our clients are most curious about

How long does a steel staircase take?

The duration depends on the stair type, its size and the cladding and paint details. From measuring to handover it usually takes 7–15 days, and 3–4 weeks on complex projects. The exact duration is stated in the written quote.

What ceiling height does a steel mezzanine need?

There is no single correct figure. Suitability depends on the existing structure, the total interior height, the intended use, the structural calculation, the applicable regulations and the project details. The height taken up by the structure and floor also varies with the chosen system; the existing height is measured at the survey and suitability is assessed together.

How much load can it carry?

It is sized by structural calculation for its intended use and cannot be increased afterwards, so what the floor will carry is settled at the survey. The engineer who runs the calculation states the capacity in the project, and the structure is dimensioned to it.

What about fire safety?

The fire resistance required for the steel members depends on how the building is used and on the project. Where required or requested, intumescent (fire-retardant) paint is applied in line with the product's technical documentation.

What rise and going should the steps have?

Riser height and tread depth are chosen together. Under Turkey's Planned Areas Zoning Regulation (Planlı Alanlar İmar Yönetmeliği, Article 31) the riser may not exceed 16 cm in buildings without a lift and 18 cm in buildings with one; the tread is set by the formula 2a + b = 60–64 (a: riser, b: tread) and may not be less than 27 cm. Which rule applies depends on the building and on how the stair is used, and is settled in the project. Raising the riser to save space is tempting, but the stair becomes dangerous going down; in a tight space the answer is a U- or L-shaped stair, not a taller riser. Every step being equal also matters: a difference of a few millimetres is enough to break the foot's rhythm and cause a trip.

Does a mezzanine need planning permission?

It depends, and there is no single answer — so be wary of anyone who says "no permission needed" before seeing the job. What decides it is whether the work adds usable floor area and whether it touches the structure. A demountable steel platform in a high-ceilinged shop and a permanent mezzanine counted into the floor area are treated differently by municipalities. In commercial premises, fire and escape-route requirements come into it as well. The correct route is to put the scheme to the municipality. How the required drawings, structural calculation and application are handled, and by whom, is settled project by project with the owner, the project designer and the engineer concerned.

How much load does a mezzanine deck carry?

It is sized to its use; there is no universal figure — the capacity is set by the engineer who runs the structural calculation and is stated in the project. A mezzanine intended for storage needs a far higher capacity than a residential one, which means an entirely different section size. The critical point: having a mezzanine built as "a bedroom for now" and later using it for storage overloads the structure. At survey we ask exactly what it will be used for, because the structural calculation is made for that use — if the use may change later, that has to be said at the start.

What height and spacing should the balustrade have?

Under Turkey's Planned Areas Zoning Regulation (Article 38), balustrades at gallery voids, at the open edges of landings and on open stairs with more than one step must reach at least 1.10 m above the floor, and no opening may let through anything larger than 10 cm in diameter — a limit meant to stop a small child's head getting stuck. The exact height at a mezzanine edge or on a stair is set in the project within these rules, according to how the building is used. Horizontal-bar designs are popular, but because they invite climbing we do not recommend them in homes with children; the same look can be achieved safely with vertical bars or glass.

Are steel stairs noisy, and can that be reduced?

A bare steel stair transmits impact into the structure, and that comes from the connection detail rather than the steel itself. We take three measures: isolation pads at the bearing points so impact does not pass straight into the concrete; heavier treads, either a thicker section or a timber covering, to add mass; and where needed an absorbent lining beneath the flight. Applied together these drop the noise noticeably — and they are hard to retrofit, because the isolation pads go in at the welding stage.

Can you carry out the work while I am abroad?

Yes. We agree the scope in writing before starting, send dated progress photographs at each stage, and can hold a video call on site whenever you want to see something specific. Keys are handed over against a written record, and the flat is cleaned and photographed again at handover.

How is the scope agreed and what does the written quote contain?

After the survey you receive a written scope listing the rooms and areas covered, the system chosen for each, the brand and product of the boards, profiles and insulation, the surface finish level, and the number of working days. Anything not on that list is not in the price, which is what stops the mid-project additions that make contractor quotes unreliable. Nothing is charged beyond the written scope without your approval.

How long before the property is usable or ready to let?

Ceilings and partitions leave the space usable as soon as the crew finishes. Painting needs longer: the film cures over roughly a week, and the smell in a ventilated flat clears within two to three days. If a flat is being prepared for tenants, plan on a few extra days after handover for airing and cleaning rather than scheduling a viewing for the day of completion.

How can I pay, and do you offer instalments?

You can pay by credit card through the QNB LinkPOS secure payment infrastructure. Instalments are available on QNB, Enpara and HSBC Advantage credit cards; credit cards from other banks can be used for a single payment. Payments are processed through 3D Secure. Cash and bank transfer are also possible.
Our Projects

Steel Stairs & Mezzanines completed work

Get a Quote for Your Project

Send us the location and scope of the job, with photos if you have them; we reply within one business day.

We also take on this work as part of a complete renovation: Renovation and Interior Refurbishment

Call NowWhatsApp