All Services
Our Services

Office Partitioning

Office and meeting-room layouts with drywall and glass partitions, with acoustic panels where needed. In rooms that need sound insulation the partition does not stop at the suspended ceiling; it runs up to the slab so sound cannot pass through the ceiling void.

Reply within one business day · Free survey · Written scope and quote

Updated:

Office Partitioning
2007
established

What is office partitioning?

Office partitioning divides an open-plan office with drywall, glass and acoustic panels into meeting rooms, manager offices and work areas. It is carried out with dust-reducing measures and on a schedule that disrupts office work as little as possible.

Acoustic isolation tape

Acoustic tape is applied where the partition meets the floor, the walls and the ceiling.

Material: A closed-cell, flexible polyethylene (PE) foam acoustic isolation tape. Its self-adhesive face bonds easily to the metal studs. The flexible cellular structure reduces direct contact and vibration transfer between the framing and the surrounding structure, contributing to the acoustic performance of the system.

What We Offer

Standard drywall partition

Board on steel studs.

Acoustic partition

Double layer with rock-wool infill.

Meeting rooms

Partitions with acoustic panelling.

Door openings

Door positions are planned at the framing stage; the partition is built around the door frame.

Acoustic tape

Self-adhesive PE foam tape at the floor, wall and ceiling junctions to reduce vibration transfer.

Who is it for?

Office Partitioning is suitable for homes, villas, offices and commercial spaces.

What affects price?

Area, selected brand/model, detail level, lighting and site conditions.

What is included?

Measurement, scope, material brand/model, workmanship and delivery terms are stated in writing.

Application process

Consultation, free survey, written quote, scheduled work and clean handover.

How We Work

At Ekin Dekorasyon ve Yapı Sistemleri the survey, the written scope and the clean handover work the same way on every project.

  • An orderly, business-like finish
  • Knauf and Dalsan products
  • Quick to build; work done with dust measures
  • Fire-rated materials where required
  • One-year workmanship warranty

Our Process

1

Preliminary assessment and survey

We first assess the job remotely and take measurements on site once the scope is clear.

2

Design & quote

We propose a solution that fits your needs and a detailed price quote.

3

Materials & preparation

Materials are sourced and the installation plan is prepared.

4

Planned installation

We carry out the work to plan, carefully and cleanly.

5

Handover

The work is completed and handed over within the scope and terms set in the written quote and contract.

FAQ

Frequently Asked Questions About Office Partitioning

We have compiled the topics our clients are most curious about

How long does it take?

The duration depends on the number of partitions, the system used and how the office operates. For example, in a mid-sized office (100–200 m²) the work usually takes 5–10 days. The exact duration is stated in the written quote.

Do the partitions keep sound in?

Yes. Sound insulation depends on the number of board layers, the infill and the frame build-up; double boarding with mineral wool makes a clear difference compared with a single-layer empty partition. We do not commit to a specific decibel value.

Can the partitions be taken down and rebuilt?

A drywall partition comes down easily and leaves little rubble, but the boards are usually not reused. If your layout is likely to change often, we plan for that together at the survey.

Do you install the electrics?

Sockets, switches, lighting and data points can all be built in.

Can the office keep working during installation?

Yes. We work after hours, at weekends or in phases so your business keeps running.

How many decibels does a meeting room need for speech privacy?

It depends on how the room is used, how private conversations need to stay and the background noise; giving one figure would be misleading. A single-layer partition with an empty cavity is usually not enough for a meeting room. A double-layer partition with mineral wool makes a clear difference, and for rooms that need high privacy — legal, medical, HR meetings — a double-frame build is discussed. Taking the partition up to the slab instead of stopping it at the suspended ceiling matters as much as the wall itself. We do not commit to a specific decibel value for our installation: if a target level is needed, the acoustic calculation is made by an engineer, and we install the chosen system to the manufacturer's details.

What is a slab-to-slab partition and why does it matter so much?

It means the partition continues to the structural slab above rather than stopping at the suspended ceiling. When a meeting room "still leaks", that is almost always the reason: the wall ends at the ceiling and sound simply crosses over the top through the ceiling void. This is called flanking, and no amount of extra thickness in the wall itself will fix it. In rooms that need privacy we take the partition to the slab and insulate within the ceiling void too.

Do glass office partitions block sound?

They do, but the spread between systems is wide. A single-glazed partition gives visual separation; its acoustic separation is limited. Double-glazed systems with an air gap perform better. If you want transparency and privacy at the same time, you need double glazing, a partition taken up to the slab and a sealed door together; if one of the three is missing, the result disappoints. The door is usually the weakest link: an unsealed door brings the wall's performance down to the door's level. The measured value of each glazed system is stated in the manufacturer's document. We do not commit to a specific decibel value for our installation: if a target level is needed, the acoustic calculation is made by an engineer, and we install the chosen system to the manufacturer's details.

How do sockets, data points and switches go into a partition?

Conduit is run through the studs while the frame is open and back-box positions are set in advance. Power and data run in separate conduits — a mains cable sharing a conduit induces noise on the data line. We never place boxes back-to-back on opposite faces; that alignment drops acoustic performance at that point, so boxes are offset by at least one stud bay. Box positions have to be finalised before the wall is closed.

How is noise controlled in an open-plan office?

In open plan the problem is not sound *transmission* but sound *build-up* — adding walls does not solve it. We work in three layers: absorption (acoustic ceiling, baffles, wall panels) shortens reverberation; blocking (desk screens, a run of storage) interrupts the direct path; separation moves concentrated talking — calls and meetings — into enclosed pods. Fitting an acoustic ceiling alone makes a noticeable difference in most offices and is the cheapest step.

Can you carry out the work while I am abroad?

Yes. We agree the scope in writing before starting, send dated progress photographs at each stage, and can hold a video call on site whenever you want to see something specific. Keys are handed over against a written record, and the flat is cleaned and photographed again at handover.

How is the scope agreed and what does the written quote contain?

After the survey you receive a written scope listing the rooms and areas covered, the system chosen for each, the brand and product of the boards, profiles and insulation, the surface finish level, and the number of working days. Anything not on that list is not in the price, which is what stops the mid-project additions that make contractor quotes unreliable. Nothing is charged beyond the written scope without your approval.

How long before the property is usable or ready to let?

Ceilings and partitions leave the space usable as soon as the crew finishes. Painting needs longer: the film cures over roughly a week, and the smell in a ventilated flat clears within two to three days. If a flat is being prepared for tenants, plan on a few extra days after handover for airing and cleaning rather than scheduling a viewing for the day of completion.

How can I pay, and do you offer instalments?

You can pay by credit card through the QNB LinkPOS secure payment infrastructure. Instalments are available on QNB, Enpara and HSBC Advantage credit cards; credit cards from other banks can be used for a single payment. Payments are processed through 3D Secure. Cash and bank transfer are also possible.

Get a Quote for Your Project

Send us the location and scope of the job, with photos if you have them; we reply within one business day.

We also take on this work as part of a complete renovation: Renovation and Interior Refurbishment

Call NowWhatsApp