Steel Mezzanines and Staircases: Height, Load and Step Geometry
A steel mezzanine is the fastest way to double the usable area of a tall space. But get three numbers wrong and the result is unusable: clear height, load capacity and step geometry. Discussing those three up front costs less than taking the structure back out.
Published: · Updated:
Height: both levels have to be usable
The commonest mezzanine mistake is an upper level nobody can stand in. Halving the total height is not the calculation — the steel structure and the deck build-up sit in between.
As a first idea: deduct an allowance for structure and deck from the total height, then split the remaining height between the lower and upper levels. How large that allowance is depends on the span, the use load and the chosen deck, and is settled by the structural calculation; the clear height needed on each level is likewise assessed against the intended use and the applicable regulations.
| Total height | First impression | Note |
|---|---|---|
| Under 3.50 m | Usually limited | Mostly limited uses such as storage are discussed |
| 3.50–4.20 m | Depends on the project | How the upper level can be used is settled by the details |
| 4.20–4.50 m | More options | Options for using both levels widen; suitability is still decided by the project |
| Over 4.50 m | More flexible planning | Planning flexibility increases; suitability is still decided by the project |
Load capacity: sized for the intended use
A mezzanine is dimensioned around what will go on it. Two structures that look identical can have very different load capacities; the difference is in the section sizes, the beam spacing and the support arrangement.
The capacity is set for the intended use by the engineer who runs the structural calculation, and it is stated in the project. There is a serious difference between residential use — bedroom, study — and archive storage, stock or racking; a full archive rack is far heavier than people expect, so the intended use has to be stated at the start.
This is not a decision that can be revised later. Raising the capacity of a built mezzanine means, in practice, building it again — which is why the intended use has to be settled at survey stage.
Step geometry: the Blondel rule
What makes a staircase tiring or comfortable is not its looks but the relationship between two numbers: the riser height and the going (tread depth).
The Blondel rule expresses that relationship, and Turkey's Planned Areas Zoning Regulation (Article 31) sets it as 2a + b = 60–64 (a: riser, b: going). For example an 18 cm riser with a 28 cm going gives 2×18 + 28 = 64 cm — within range.
Under the same article the riser may not exceed 16 cm in buildings without a lift and 18 cm in buildings with one, and the going may not be less than 27 cm. Which rule applies depends on the building and how the stair is used, and is settled in the project. Above a 20 cm riser the stair starts to feel like climbing; below a 25 cm going the foot no longer lands fully and descending feels unsafe.
- Every riser must be the same height — a single odd step is a fall waiting to happen.
- On winder steps, the going is measured 40 cm from the inner edge.
- At least 2.00 m of headroom is needed above the flight.
- Width: 80 cm is acceptable in a home, 90 cm is comfortable.
Balustrades and safety
The mezzanine edge and the staircase are fall risks, and a balustrade is not optional.
Under Turkey's Planned Areas Zoning Regulation (Article 38), balustrades at gallery voids, at the open edges of landings and on open stairs with more than one step must reach at least 1.10 m above the floor, and no opening may let through anything larger than 10 cm in diameter — a limit meant to stop a small child's head getting stuck. The exact height at a mezzanine edge is set in the project within these rules.
Balustrades with horizontal members (climbable like a ladder) should be avoided in homes with children. Glass balustrades use laminated safety glass; a single toughened pane empties the opening completely when it breaks.
Permits and regulation
How a mezzanine is treated for permits and regulations does not come down to a single rule; the type of use of the building, its relationship to the existing structure and local zoning rules decide it. How the load is carried and how it connects to the existing building are set by the structural calculation.
Especially where it creates a permanent increase in floor area within a unit, the position under property and planning regulation can change. We recommend discussing the permit position with the building management before starting.
Commercial use brings fire escape and occupancy calculations into play as well; on those projects it is worth reviewing the design with the project architect.
In short
- Whether a mezzanine is feasible is not decided by a single height figure; the existing building, intended use, structural calculation and regulations are assessed together.
- The height taken up by structure and deck depends on the system and the span; it is settled by the structural calculation.
- Load capacity cannot be raised afterwards; settle the intended use at survey stage.
- Steps: 2a + b = 60–64; riser at most 16 cm without a lift, 18 cm with one; tread at least 27 cm (Planned Areas Zoning Regulation, Article 31).
- Balustrade at least 1.10 m, openings no wider than 10 cm (Article 38); glass balustrades use laminated glass.